Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

@https:
heavyliftpfi.com > equipment > 09/03/2026 > collett-bolsters-offering-with-greiner-busy-1050

Collett bolsters offering with Greiner BUSY 1050

15+ hour, 45+ min ago   (108+ words) UK-based Collett & Sons has added a Greiner BUSY 1050 to its fleet – the first bridge crossing system in the heavy haulier’s arsenal. UK-based Durham Lifting is supporting Pallion Shipyard’s return to operation by providing specialist lifting equipment and servicing know-how to…...

@https:
heavyliftpfi.com > equipment > 07/29/2026 > modulift-1000-tonne-spreader-beam-conducts-extreme-load-test-in-germany

Modulift 1,000-tonne spreader beam conducts extreme load test in Germany

1+ mon, 5+ day ago   (139+ words) Specialist lifting equipment manufacturer Modulift’s 1,000-tonne capacity MOD 800J/1000 spreader beam has been used to conduct an extreme load test in Germany. Dutch transport engineering specialist Mammoet has invested in new lifting and transport equipment in Saudi Arabia, including five all-terrain…...